Contract and Building procedure:
After you have secured the financing for your building plans, we make together with you a building contract and provide you the planning application papers for your house. If we keep to the stipulations when planning your build, then your building project is automatically granted and building can begin at the latest after 4 weeks.
Now at the latest you must decide which prefabricated version you really want.
Whether
A finished house,
A prefabricated house,
Do it Yourself- Plus- House,
Do it Yourself House.
The borders of the prefabricated version are fluid and can be varied and agreed by you and your building adviser according to your personal needs.
You are never alone during the entire building phase, rather one of our building engineers is there as your personal adviser in word and deed until you move in and also available after that.
Also the Management of Bio-Solar-Haus looks after you, because your house is also your "personal baby"
Nature's building principle a house in a house
Klaus Becher: "Nature beats Technology! Nature is infinately superior to Technology, physical processes operate more sustainably than machines."
The decisive difference to all other low energy houses is:
Bio-Solar-Houses need no moisture barriers and no ventilation systems!
A partly glazed weather protected house heats up like a greenhouse with the daylight the well thermally insulated house cladding of the inner timber house from outside. The steam produced inside the house by the occupants diffuses together with the associated smells, without being able to condense the damaging condensate through the diffusion opening inner house cladding into the air space between the inner house and the weather protected house. From there it goes outside naturally under its own steam through the openings.
Nature renders moisture barriers superfluous for protecting the house cladding from condensation damage and possibly unhealthy ventilation systems for dehumidification of the living space.